Other informations:
- Transport fee: minimum 6 m³/ car,
Emptying time of the mixer truck: 30 minutes, after which downtime will be charged, - Concrete pump: 1 hour off and 1 hour on + 2 man-hours (minimum total 4 hours); beyond 2 man-hours, an additional hour will be charged for each hour started.
- The possibility of cleaning the concrete pump after operation must be provided by the customer; if this is not possible, an additional charge of 1 hour will be made.
- A minimum charge of 4 hours will be made for cancellation of the ordered concrete pump within 24 hours before the ordered concrete pump is due to be out of service.
- If the concrete pump is not cancelled within 24 hours prior to the turnaround time, a capacity tie-up fee of HUF 1,500 + VAT / m3 will be charged.
- Assistance will be provided in obtaining collection permits, but any costs incurred will be invoiced to the Customer.